2.5 MW Cogeneration Unit
New construction and installation of a modular cogeneration unit with a waste-heat recovery boiler, based on a 2.5 MW gas-piston engine, located at an existing boiler plant. The unit generates electricity for supply to a 10 kV grid and recovers heat, delivering it into the return pipeline (T2) of the existing district heating network.
Project overview
-
Total budget
UAH 100.0 million
-
Financing need
investment / co-financing
-
Stage
Detailed design
-
Location:
Irpin
Key features
-
Located at an operating boiler house with existing networks
-
18 million kWh of electricity and 7,082 Gcal of heat per year
-
Simultaneous generation of two types of energy from a single fuel
-
On-site generation for the community's critical infrastructure
Brief description
New construction and installation of a modular cogeneration unit with a waste-heat boiler based on a 2.5 MW gas piston engine at the existing boiler house at 9 Yaroslavska St. The unit generates electricity for the 10 kV grid and recovers heat into the T2 return pipeline of the existing district heating network.
-
Key figures
- Electrical capacity:
- 2.5 MW
- Thermal capacity:
- 1.95 Gcal/h
- Operating hours:
- 8,000 h/year
-
Project economics
- Electricity cost:
- UAH 4.284/kWh
- Annual savings:
- UAH 39.63 million
- Payback:
- 1.92 years (per feasibility study)
-
Implementation
- Electricity cost:
- UAH 4.284/kWh
- Annual savings:
- UAH 39.63 million
- Payback:
- 1.92 years (per feasibility study)
Security context
An energy infrastructure facility. Operating modes, grid connection schemes and technical specifications are not disclosed in public materials. Construction is carried out in accordance with Cabinet of Ministers Resolution No. 1320 of 07.12.2023.
Financing and request to partners
- FINANCING TYPE: Grant / Loan / ESCO / Blended
- REQUEST TO PARTNERS: Financing / Equipment supply