CON­STRUC­TION OF A WASTE PRO­CESS­ING AND WASTE-­TO-EN­ERGY PLANT IN FASTIV

Construction of a modern municipal solid waste processing and disposal complex in Fastiv, featuring advanced sorting and recovery of recyclable materials, including metal, glass, plastic, and paper. The organic fraction will be processed with the potential for biomethane production.

The project aims to achieve 100% MSW utilization and reduce landfilling to 15%.

CONSTRUCTION OF A WASTE PROCESSING AND WASTE-TO-ENERGY PLANT IN FASTIV

Project overview

  • Total budget

    € 59.8 million

  • Financing need

    € 47.8 million

  • Stage

    FEASIBILITY STUDY (FS)

  • Location:

    Fastiv / Kyiv Region

Kyiv Oblast on the map of Ukraine

Key features

  1. Capacity of up to 130,000 tones of waste/year; strategic location in Fastiv

  2. Integrated municipal solid waste management solution; reuse of secondary materials and energy

  3. Advanced sorting, organic waste processing and gasification; minimization of landfilling

  4. ≈230 new jobs; development of circular economy & investment attraction

Brief description

Construction of a modern municipal solid waste processing and disposal complex in Fastiv, featuring advanced sorting and recovery of recyclable materials, including metal, glass, plastic, and paper. The organic fraction will be processed with the potential for biomethane production.

The project aims to achieve 100% MSW utilization and reduce landfilling to 15%.

  • CAPACITY & MARKET

    Capacity:
    130,000 t/year
    Syngas Electricity:
    8 MW/h
    Rooftop Solar:
    1 MW
    Energy Storage:
    32 MW
    Jobs Created:
    ≈230
    Target Market:
    Ukraine / Kyiv Region
  • FINANCIAL INDICATORS

    Total Cost:
    €59.805 million
    Available (20%):
    €11.961 million
    Financing Need (80%):
    €47.844 million
    Expected Profit:
    ≈ €9.8 million / year
  • IMPLEMENTATION

    Land Plot:
    ≈4.5 ha
    FS Status:
    Permitting & docs require completion
    Key Facilities:
    Receiving department, 2 sorting lines, Preparation section, Gasification (3×6 t/h)

Security context

Due to the ongoing security situation in Ukraine, detailed information on project location, technical infrastructure and equipment is not publicly disclosed. Implemented in compliance with safety & environmental requirements.

Financing and request to partners

  • FINANCING TYPE: Direct investment / lending / grant financing
  • INVESTOR ASK: 80% financing (€47.844 million) / international or banking financial partner / technology partner